Client :
Roy Hill
We were engaged by Fortescue to undertake the detailed design for the replacement of its Overland Variable Speed Drive (VSD) Read more
Client :
Roy Hill
We were engaged by Fortescue to complete the 30% engineering design for the upgrades to the existing and new Fire Read more
Client :
Roy Hill
We were engaged by MinRes to complete a surface water assessment for the 2024 operations expansion mine plan, at their Read more
Client :
Roy Hill
BGER were engaged to provide the detailed designs of multiple heavy vehicle wash facilities for IPL's Kooragang Island operations. Read more
Client :
Roy Hill
We were engaged by Pilbara Minerals to support their Switchroom upgrade as part of the P1000 Expansion Project. Read more
Client :
Roy Hill
We have joined the Australian Renewable Energy Agency (ARENA) funded research and development project that is leading research to enable Read more
Client :
Roy Hill
We have been engaged by RTIO to conduct a safety review regarding its overhead conveyors at both Brockman 2 and Read more
Client :
Roy Hill
We were engaged to conduct a pre-feasibility study for the major upgrades of Bloomfield Colleries’ Coal Handling and Preparation Plant Read more
Client :
Roy Hill
We were engaged by Rio Tinto Iron Ore to mitigate the risks of slope failure of the embankment at the Read more